Shipping from China to Israel
Containers to Ashdod and Haifa Bay via Suez, air freight into Tel Aviv. Israel is not in the GCC customs union: duty is set line by line, 18% VAT is charged on the full landed cost, and purchase tax hits specific categories. We run that file, including the SII conformity route, before the box sails.
Four things that differ from the Gulf
Do not reuse a Gulf quote for an Israeli shipment: the tax, the duty and the standards regime are different from the ground up.
18% VAT on landed cost
Charged on CIF plus duty plus purchase tax, not on the invoice. Paid at release and recovered later by a registered dealer.
Purchase tax on some goods
Vehicles, electronics, tobacco and alcohol carry an additional purchase tax that can exceed the customs duty itself.
The SII conformity route
Since 2025, goods complying with European legislation can enter under a declaration rather than full testing — provided the factory file is complete before shipment.
Allocated e-invoices
Input VAT deduction is now tied to an allocated electronic invoice number. An unnumbered invoice delays the claim, not the cargo.
Arrival ports and airport
Containers through the Mediterranean only; Eilat is out of the equation for now.
Ashdod
Mediterranean — southern IsraelThe country’s largest container gateway and the closest to Tel Aviv and the southern industrial belt. A new private container terminal has lifted annual capacity.
Haifa Bay
Mediterranean — northern IsraelA modern private container terminal alongside the government port. Serves the north, the Galilee and the large plants, and is the alternative when Ashdod is full.
Eilat
Red SeaThe Red Sea port, but container activity has effectively stopped because of conditions in the Red Sea. We do not plan on it and move boxes through the Mediterranean instead.
Ben Gurion Airport
TLVFor urgent and high-value air cargo. Direct capacity from Shanghai and Guangzhou, with daily connections via Dubai and Istanbul.
Transit Times from China to Israel
From the Chinese terminal to your warehouse, canal waiting included.
| Method | Lane | Duration | Note |
|---|---|---|---|
| Sea FCL | Shanghai / Ningbo → Suez → Ashdod | 22–30 days | The standard lane for full containers |
| Sea FCL | Shenzhen / Shanghai → Suez → Haifa Bay | 23–31 days | Better for the north and the Galilee |
| Sea LCL | Shenzhen / Ningbo → Ashdod | 27–38 days | Add 5–8 days for groupage and de-stuffing |
| Air | Shanghai / Guangzhou → Tel Aviv (TLV) | 3–6 days | Door-to-door with DDP typically 6–10 days |
Israel Shipping Services
Full container FCL
To Ashdod or Haifa Bay, with the import declaration classified in advance.
LCL groupage
Consolidated in Shenzhen or Ningbo and sailed to Ashdod. Suited to shipments under 15 CBM.
Air freight to Tel Aviv
3–6 days into TLV, and typically 6–10 days door to door with DDP.
The Israeli import file
Tariff classification, purchase tax modelling and an SII conformity review for regulated products before shipment.
Inland distribution
Trucks from Ashdod and Haifa to Tel Aviv, Jerusalem, Beersheba and the industrial zones.
Project cargo
Production lines, power equipment and out-of-gauge loads, with route surveys where needed.
Importing into Israel — five lines
The customs duty may be the smallest line on the invoice. VAT and purchase tax are the large numbers.
| Line item | How it is set | Why it matters |
|---|---|---|
| Customs duty | By tariff line and origin; no free trade agreement with China | Assessed on CIF value and varies widely between goods |
| Purchase tax | A rate or fixed amount on specific goods: vehicles, electronics, tobacco, alcohol | Can exceed the customs duty and change whether a product is viable |
| VAT | 18% on CIF plus duty plus purchase tax | Paid in cash at release, recovered later by a registered dealer |
| SII conformity | Mandatory standard for goods such as electricals, toys and building materials, with a declaration route for EU-compliant products | No conformity document, no release |
| E-invoicing | An allocated invoice number is required to deduct input VAT | An unnumbered invoice delays the refund, not the shipment |
Departure Ports and City Coverage
From six Chinese ports to Israel’s cities and industrial zones.
Shenzhen
Our HQ — fastest consolidation
Guangzhou
Furniture and building materials
Ningbo
Mediterranean services
Shanghai
Widest schedule choice
Qingdao
Machinery and materials
Xiamen
Electronics and appliances
Israeli cities we deliver to
Cargo We Ship to Israel
A high-value market with strict conformity — the document comes before the price.
Electronics
Phones, computers, accessories
Home appliances
Ovens, AC units, washing machines
Solar equipment
Panels, inverters, storage
Building materials
Ceramics, aluminium, sanitary ware
Furniture and décor
Home and office
Spare parts and machinery
Automotive, machinery, equipment
Frequently Asked Questions
How long does shipping to Israel take?
- Ashdod: 22–30 days
- Haifa Bay: 23–31 days
- LCL: add 5–8 days
- Air to Tel Aviv: 3–6 days, and 6–10 days with DDP
What taxes apply to Chinese goods?
Is Eilat an alternative to Ashdod?
What is SII and what do I need to provide?
Do you offer full DDP?
Get a Quote Within 24 Hours
Send the origin city, the Israeli destination and the tariff code if you have it. Quotes are issued in AED, SAR or CNY, with duty and taxes shown separately.
Or contact us via WhatsApp:
WhatsApp — Instant ResponseRead next
Transit recovery, and the rates that have not come down.
The other eastern Mediterranean market, with a similar non-tariff cost structure.
The other side of the Suez gateway.
Our team is ready to assist you