Project Cargo & Oversized Freight

Specialized shipping solutions for heavy machinery, industrial equipment, and oversized cargo. From factory in China to project site in the GCC — we plan every step with precision.

OOG / Break Bulk Heavy Equipment Oil & Gas

Specialized Shipping Methods for Projects

We select the optimal shipping method based on your equipment's dimensions, weight, and nature. Every project gets a custom solution.

Most Used

Flat Rack Containers

Open-sided and open-top platform. Ideal for machinery exceeding standard container width or height.

  • Up to 45 tons capacity
  • 20ft & 40ft available
  • Stackable at ports
GeneratorsCNC MachinesBoilers
For Tall Cargo

Open Top Containers

Container with removable roof. Perfect for tall equipment needing vertical crane loading from above.

  • Vertical crane loading
  • Suitable for excess height
  • 20ft & 40ft available
Long PipesCranesSteel Structures
For Extra-Large Cargo

Break Bulk Shipping

For cargo that won't fit containers. Shipped directly on the vessel deck as individual units.

  • No size limits — anything
  • Heavy port equipment handling
  • Specialized marine securing
TurbinesTransformersTower Cranes

Industries We Serve

Transporting equipment and machinery for the Middle East's largest industrial sectors — from oil & gas to infrastructure.

Oil & Gas

Drill pipes, valves, pumps, refining equipment, rigs, and compressors. Full support for Aramco, ADNOC, and QatarEnergy projects.

Construction & Infrastructure

Tower cranes, concrete mixers, drilling equipment, generators, and steel structures. Supporting NEOM, Qiddiya, and Dubai Metro projects.

Factories & Production Lines

CNC machines, packaging lines, industrial furnaces, conveyor belts, and presses. Full factory relocations from China to the GCC.

Power & Energy

Wind turbines, solar panels, high-voltage transformers, heavy power cables, and energy storage systems.

Water Desalination

Mobile desalination units, high-pressure pumps, RO membranes, treatment tanks, and purification systems. Vital for GCC countries.

Transport Equipment

Buses, heavy trucks, railway equipment, metro cars, and airport equipment. Supporting national transport projects in the GCC.

Project Cargo Lifecycle

A structured methodology for managing project cargo from start to delivery at the project site.

1

Feasibility & Project Assessment

We study your equipment's dimensions, weights, and nature. Review technical drawings and specs. Determine optimal shipping method (flat rack, open top, break bulk) and estimate total cost and timeline.

2

Route Planning & Logistics Engineering

We map the full transport route: road from Chinese factory to port, sea route, and road from destination port to project site. Verify bridge/tunnel clearances and coordinate special permits with local authorities.

3

Engineering Packaging & Crating

We supervise export-standard packaging: moisture and rust protection, professional lashing & securing, ISPM-15 heat-treated wooden crates, and special protection for sensitive components. Every item is documented and photographed pre-shipment.

4

Ocean Freight & Monitoring

We ship equipment on the appropriate vessel with dedicated space. Coordinate with captain and crew for loading arrangements. Weekly status reports on cargo location and condition. For break bulk, we provide a surveyor to supervise loading and discharge.

5

Customs Clearance & Site Delivery

We handle customs clearance for heavy equipment with all special permits. Coordinate heavy road transport using specialized trailers (lowboy, modular). Ensure safe offloading at the final site. Our presence doesn't end at delivery — we follow up through to commissioning.

6

Handover & Project Closure

We document the complete delivery: photos of equipment at project site, technical condition report, all shipping and clearance documents, project completion certificate. A comprehensive final report for future project reference.

Examples of Cargo We Transport

Cargo TypeApprox. WeightShipping MethodTransit Time
Gas Turbine80-150 tonsBreak Bulk25-35 days
HV Power Transformer40-120 tonsFlat Rack / Break Bulk22-30 days
Tower Crane (knocked down)30-80 tonsFlat Rack + Open Top22-28 days
Industrial Press15-50 tonsFlat Rack20-25 days
Large CNC Machine8-25 tonsFlat Rack / Open Top20-25 days
Complete Production Line (KD)50-200 tonsMultiple + Break Bulk25-40 days
Industrial Generator5-30 tonsFlat Rack18-22 days
Drill Pipes (12m length)1-5 tons/pipeOpen Top / Break Bulk20-25 days

Why Choose Our Project Cargo Service?

Dedicated Project Manager

Every project has a dedicated manager — one point of contact from start to delivery. No dealing with multiple departments.

Complete Logistics Engineering

Our engineering team reviews equipment drawings and plans loading, securing, and discharge. We ensure equipment safety from factory to site.

Special Road Permits

We obtain heavy transport road permits in GCC countries. Coordinate with traffic and municipalities for temporary road diversions when needed.

Comprehensive Project Insurance

All-risk policy covering the full project journey: road transport, ocean freight, loading/unloading, and temporary storage. Coverage up to full equipment value.

Discuss Your Project With Experts

Send us details of the equipment you need to move and we'll respond with a feasibility study and shipping plan within 48 hours.

  • Free feasibility study for your project
  • Optimal shipping method determined
  • Cost & timeline estimates
  • Dedicated project manager

Start Your Project Cargo Shipment

Fill out the form and a dedicated project manager will contact you within 48 hours.

Project Cargo FAQ

What exactly is OOG (Out of Gauge) cargo?
OOG cargo is any shipment exceeding standard 40ft container dimensions: width > 2.35m, height > 2.39m, or length > 12.03m. Also includes cargo exceeding standard container weight limits (>28 tons for 20ft). This requires specialized equipment and custom planning.
How much does shipping heavy equipment cost vs regular freight?
Project cargo costs more than standard freight due to: specialized container equipment, extra port handling charges, special transport permits, higher insurance, and engineering planning. But we help optimize costs by: disassembling large equipment when possible, consolidating shipments, and selecting optimal ports. Each project is priced individually.
Do you transport equipment to inland sites far from ports?
Yes, this is one of our key strengths. We transport heavy equipment from port to any location in GCC countries — even remote desert sites. We provide specialized trucks (lowboy trailers, modular trailers) and handle all heavy transport road permits and government coordination. We've moved equipment to inland sites 800+ km from the port.
How long does a complete project cargo operation take?
Duration varies by project complexity: Planning phase 1-2 weeks (feasibility, permits, engineering). Road transport in China 3-7 days. Ocean freight 16-25 days. Customs clearance 3-7 days. Road transport to destination 2-7 days. Approximate total: 30-50 days from planning start to final delivery.
What about insurance for heavy equipment during transit?
We provide All-Risk comprehensive insurance covering: road transport in China, vessel loading, ocean freight, port discharge, and road transport to final destination. Coverage includes: total and partial loss, damage, theft, and marine accident damage. Insurance value = equipment value + freight cost + 10%.
Can you relocate an entire factory from China to the GCC?
Yes, we've relocated entire factories! We send a team to the factory site in China to supervise: machine disassembly, numbering and documenting every piece, packaging each component according to its sensitivity, shipping components in coordinated batches, and reassembly at the new GCC site. We offer complete factory relocation service including customs clearance for all equipment.